Skip to content
5 minWebsites

How long does a new dental practice website really take?

Longer than the build itself, usually. Design and development are rarely what holds a practice website up. Waiting for copy, photos, sign-off and logins is. Here is how the stages tend to run, what slows them down, and how to keep yours moving.

A wooden hourglass in front of a white brick wall.
Photo: Quilia on Unsplash

BlogPublished By the 78 Dental team

The short answer

For a standard practice website, somewhere around six to twelve weeks from the first meeting to launch is a fair expectation, followed by a few weeks of settling in. Treat that as typical, not guaranteed.

A small site with every word and photo ready on day one can be quicker. A larger site, a rebrand alongside it, or a practice where several partners need to agree every page will usually take longer. The week ranges below are rough guides. Stages overlap, and the slowest one sets the pace.

The stages, one by one

  • Discovery (around 1 to 2 weeks): agreeing what the site is for, the treatments you want to grow, the pages you need, and what on the old site is worth keeping.
  • Content and photography (around 2 to 4 weeks, often alongside design): writing or editing treatment pages and team biographies, and getting the practice and team photographed.
  • Design (around 2 to 3 weeks): layouts for the key pages, agreed with you, usually with a round or two of changes.
  • Build (around 2 to 4 weeks): developing the pages, connecting your booking or enquiry forms, and setting up analytics and the cookie banner.
  • Review and compliance check (around 1 to 2 weeks): the practice reads every page, the site is checked against GDC and ASA rules, and everything is tested on phones.
  • Launch and redirects (a few days): pointing the domain at the new site, redirecting old page addresses to their new homes, and checking nothing is broken.
  • The first weeks after launch (roughly 4 to 8 weeks of close watching): checking enquiries arrive, watching Google Search Console for errors, and fixing what real patients run into.

Discovery and design are where you have the most influence for the least effort. A clear decision early about which treatments matter most saves rewriting pages later.

During the build, one detail is worth raising early. If you run Google or Meta ads, the ICO is explicit that advertising tracking needs the visitor's consent, so the cookie banner has to be set up properly rather than bolted on at the end.

Why the review stage needs real time

It is tempting to skim the finished site and say yes. Resist it. The GDC's guidance on advertising expects a practice website to show:

  • the practice name and the address where care is provided
  • contact details, including an email address and phone number
  • the GDC's contact details or a link to its website
  • your complaints procedure, and who patients can contact if they are not satisfied with your response
  • the date the website was last updated

Each dental professional named as providing care also needs their qualification, the country it came from, and their GDC number displayed. Titles that imply specialist status, such as orthodontist, are only for dentists on a GDC specialist list.

Every clinician should read their own biography. The GDC is clear that when information carries your name, you are responsible for checking it is correct, whoever wrote it.

Launch day, and the weeks after

If page addresses change, each old page that matters should be permanently redirected to its new equivalent. Google recommends keeping those redirects for as long as possible, and generally for at least a year.

Expect some movement in search results. Google says that with any significant change to a site, rankings can fluctuate while it recrawls, and for a medium-sized site it can take a few weeks or more before the new addresses replace the old ones. That is normal. What you want is someone watching closely, so a genuine problem is caught early rather than discovered in next quarter's numbers.

What usually causes delays

  • Waiting on content. Treatment pages and team biographies get written between patients, which means they often do not get written at all.
  • Photos. Getting the whole team photographed on one day, in a tidy surgery, is harder to arrange than it sounds.
  • Sign-off from several partners. Each round of comments from a different person restarts the clock.
  • Access to the old domain and DNS. The previous designer has moved on, the registrar login belonged to a former practice manager, or nobody is sure who holds it.
  • Third-party systems. Connecting online booking can depend on your practice management software provider, who works to their own timetable.
  • New pages added mid-build. Each one is reasonable on its own. Together they move the launch date.

What to prepare before you start

Most of it is quick to gather. Team photos and a bio for every clinician take longest, so start those first. Getting all of this together before the build starts is the most reliable way to shorten the whole project.

  • One named person with the authority to sign off, agreed by all the partners
  • Logins for your domain registrar and DNS, or the name of whoever holds them
  • Access to your current hosting, Google Business Profile, Google Analytics and Search Console
  • Every clinician's qualification, country of qualification and GDC number
  • Your current complaints procedure
  • Opening hours, fees, and the treatments you want to promote (and any you have stopped offering)
  • Logo files and any brand colours or fonts
  • Photos you own the rights to, or a date pencilled in with a photographer
  • The name of your booking system and a contact there

When comparing quotes, ask each provider for a stage-by-stage plan with the practice's own tasks written on it. That kind of plan is a fair thing to ask of anyone.

?Common questions
Can a dental website be built in two weeks?
A very simple one can, if every word, photo and login is ready on day one and one person signs off. That is rare. Be wary of a short promised timeline that says nothing about what you need to supply.
Does our old website stay live while the new one is built?
It normally should. The new site is built and reviewed on a separate, private address, and the old one keeps working until launch day.
Will our Google rankings drop when the new site goes live?
Some short-term movement is normal while Google recrawls the site. Permanent redirects from every old page that matters to its new equivalent are what stop a temporary wobble turning into a lasting loss.

Planning a new website?

We only build for dental practices, you get a written quote before you commit, and you own the site outright. Ask for a free audit of your current site, or book a no-pressure call.